Page 2 - Pronto-Panel-Low-Rise-Intertenancy-Technical-Manual-Final
P. 2
PRONTO PANEL
Scope Notes
This technical manual sets out to provide builders, designers CAD details for the system are available on the
and installers what is needed to: Pronto Panel website.
1 specify Pronto Low Rise Intertenancy Wall systems during Wall systems built differently to what is detailed in this
design phase manual and the online CAD details may not meet the
requirements for the building as detailed in the NCC. It is the
2 install Pronto Panel on site by giving high level construction responsibility of users of the product to research and select
guidance following common building principles and the most appropriate system for their purpose, and to install
provide the most common details as per the details and guidance provided.
3 achieve NCC compliance of the build by listing relevant Please do not hesitate to contact your Brickworks Sales
CodeMark, Fire & Acoustic certificates, and representative to discuss build options.
4 meet Brickworks’ Warranty requirements
/ 2 /